Project Description
The Ebbetts Pass Reach 3A water transmission line is located in Arnold starting near Lakemont Drive, follows State Route 4 in front of the Meadowmont Shopping Center and golf course and ends in White Pines. The system operates at pressures in excess of 250-psig. The project consists of replacing approximately 15,000 feet of 10-inch and 12-inch diameter water lines and replacing and/or refurbishing numerous pressure reducing stations.
Project Purpose
The existing concrete cylinder pipeline was installed in 1965 and is being replaced due to its age, poor condition and high frequency of recent failures and repairs that are a risk to public safety and property.
You must be logged in to post a comment.
Recent CCWD News
- CCWD Seeks Community Input, Releases Local Hazard Mitigation Survey March 30, 2023
- CCWD’s Regular Board Meeting March 22, 2023 March 17, 2023
- Ebbetts Pass Town Hall Meeting-Canceled March 14, 2023
- External Relations Committee Meeting March 14, 2023 March 10, 2023
- Copperopolis Town Hall Meeting-March 20th at 5:30 p.m. March 6, 2023