Arnold community members engaged in a constructive Q&A session with CCWD staff Tuesday evening at the Reach 3A Pipeline Replacement Project community meeting held at Independence Hall in White Pines. After a 30-minute presentation by CCWD staff members that outlined the $5.3 million project, the next 30 minutes consisted a series of excellent questions from attendees …

Read more

The Calaveras County Water District is holding a community meeting at 6 p.m. Tuesday April 26 to provide residents with information regarding the Reach 3A Transmission Pipeline Replacement Project in downtown Arnold. Construction will begin in May and the project is expected to be complete in November. This project will replace about 20,000 feet of 12-inch diameter …

Read more

The Calaveras County Water District Board of Directors awarded the construction contract for the Reach 3A water transmission pipeline replacement project in Arnold at its meeting Wednesday, April 6. This pipeline was originally installed in 1965 and is being replaced due to its age, poor condition and high frequency of failures and repairs that pose risks …

Read more

Reach 1 Waterline Replacement Project Description The Ebbetts Pass Reach 1A water transmission line starts near the water treatment plant at Hunter Dam Road and follows State Route 4 downhill to the west towards Red Apple Ranch. The system operates at pressures in excess of 250-psig. The project consists of replacing approximately 12,000 feet of …

Read more

12″ Techite Waterline Replacement Project Description Replace 11,400-feet of existing 14-inch Techite water line with new 12-inch C900 PVC or ductile iron water main. The replacement line will follow the existing alignment along parts of Sierra Parkway and Meko Drive. Project Purpose CCWD has 11,400 feet of 14-inch diameter Techite line in the Ebbetts Pass …

Read more

Reach 3A Water Transmission Pipeline Replacement Project Description The Ebbetts Pass Reach 3A water transmission line is located in Arnold starting near Lakemont Drive, follows State Route 4 in front of the Meadowmont Shopping Center and golf course and ends in White Pines. The system operates at pressures in excess of 250-psig. The project consists …

Read more

Redwood Tank Replacement FEMA Hazard Mitigation Grant Project Project Description Replace two existing redwood tanks in the Big Trees area with steel tanks of fire resistant construction; the 60K Tank with a 80,000 gallon steel tank and Tank #1 with a 150,000 gallon steel tank. Construct 750-feet of new 8-inch water line to new 150,000 …

Read more
Page 6 of 6 First page...23456