Copper Cove , Poker Flat Lift Stations 8, 12 & 13 Lake Tulloch Force Main Bypass Project Description The main sewer flows from Poker Flat LS 8 to LS 12 via an existing 6″ PVC force main in proximity of Lake Tulloch. From LS 12 the sewer is pumped to LS 13 and then pumped a …

Read more

Copper Cove Relaim Permit Project Project Description The District currently has a time schedule order (TSO) issued by the Central Valley Regional Water Quality Control Board and is following a compliance schedule to meet the TSO requirements. Project Purpose This is a mandatory compliance issue; the District must secure an updated permit for wastewater treatment, …

Read more

Tank Management Plan Project Description The District has numerous welded steel water tanks constructed as far back as the 1970’s that are in varying levels of disrepair due to coating failures and subsequent corrosion, especially the roof structure. A Tank Management Plan will be prepared to assess the condition of all the District’s tanks, develop …

Read more

Reach 1 Waterline Replacement Project Description The Ebbetts Pass Reach 1A water transmission line starts near the water treatment plant at Hunter Dam Road and follows State Route 4 downhill to the west towards Red Apple Ranch. The system operates at pressures in excess of 250-psig. The project consists of replacing approximately 12,000 feet of …

Read more

12″ Techite Waterline Replacement Project Description Replace 11,400-feet of existing 14-inch Techite water line with new 12-inch C900 PVC or ductile iron water main. The replacement line will follow the existing alignment along parts of Sierra Parkway and Meko Drive. Project Purpose CCWD has 11,400 feet of 14-inch diameter Techite line in the Ebbetts Pass …

Read more

Reach 3A Water Transmission Pipeline Replacement Project Description The Ebbetts Pass Reach 3A water transmission line is located in Arnold starting near Lakemont Drive, follows State Route 4 in front of the Meadowmont Shopping Center and golf course and ends in White Pines. The system operates at pressures in excess of 250-psig. The project consists …

Read more

Redwood Tank Replacement FEMA Hazard Mitigation Grant Project Project Description Replace two existing redwood tanks in the Big Trees area with steel tanks of fire resistant construction; the 60K Tank with a 80,000 gallon steel tank and Tank #1 with a 150,000 gallon steel tank. Construct 750-feet of new 8-inch water line to new 150,000 …

Read more

CCWD District 2 Director Terry Strange CCWD General Manager Dave Eggerton The Sheep Ranch community asked that CCWD attend its community meeting Friday, April 24. CCWD General Manager Dave Eggerton was joined by District 2 Director Terry Strange and Community Relations Manager Joel Metzger at the event. Community members were given an overview of the emergency drought situation …

Read more

CCWD Board Meeting – April 22, 2015

Read more

CCWD Board Meeting – March 25th, 2015